Home / living-room-furniture / Vesgantti Small 2 Seater Sofa, 121cm Velvet Sofa with Spring Cushion, Mini Bedroom with Armrests, Modern Living Room Loveseat, Fixed 2 Seater Loveseat

Vesgantti Small 2 Seater Sofa, 121cm Velvet Sofa with Spring Cushion, Mini Bedroom with Armrests, Modern Living Room Loveseat, Fixed 2 Seater Loveseat

18 sold
Quantity
ADD TO CART
BUY IT NOW
  • Detail

    About this article

    • Spring Cushion - This sofa provides support and a cushioned feel, which enhances the overall comfort of the sofa. The springs help absorb the impact of repeated use and prevent the cushions from deteriorating quickly. This extends the life of the small sofa and reduces the need for frequent replacement.
    • High Resilience Foam - This premium foam living room sofa provides comfortable seating and stable support for your body. The high resilience means it can withstand repeated use, retaining its shape and support properties over time, even if you sit and lie down frequently.
    • Sturdy Sofa Frame - Our 2-seater sofa frames are made of high-quality, sturdy wood, which is less likely to warp or crack over time. There are also non-slip pads on the legs to prevent the velvet sofa from sliding or damaging the floor. With a maximum load capacity of 400 kg, it is very suitable for home and office use.
    • Luxurious Velvet Texture - Known for its soft, plush texture that feels luxurious to the touch. High-quality velvet fabrics are resistant to abrasion and pilling, and retain their luxurious appearance even with frequent use. This sofa is made from a special double-sided velvet fabric, the colors of which vary depending on the orientation of the fabric. In addition, due to different light and monitor, there will be a slight color difference, the sofa image has been as much as possible to restore the most real color
    • Enjoy Your Leisure Time - Easy to assemble in 4 steps (recommended for 2 people), you can set up this mini sofa in just 10 minutes. Please be careful not to scratch the sofa when you open the vacuum packaging. The cushions need 24-48 hours to fully recover due to the compressed packaging. So it is not very fluffy and comfortable when you just unpack it, you can pat the cushion to make it fluffier and more comfortable

    Advantages of the Vesgantti 2-seater sofa

    including a blue foam insert and a wooden support frame with sliding mechanism under a blue covering.

    Vesgantti sofa with springs:

    • Improves the overall comfort of the sofa by providing a supportive and cushioned feel.
    • Helps absorb the impact of repeated use, preventing cushions from deteriorating quickly.

    Modern furniture safety illustration showing a sofa with white cushions and a red 'no' symbol warning of potential hazards underneath.

    Sofas without spring blocks:

    • Gives an impression of hardness.
    • Non-durable, short lifespan


    Product Details

    Color Blue
    Sofa size 121L x 77W x 86H CM
    Weight capacity 400 KG
    Number of places 1-2 Places
    Materials Wood, Velvet Fabric, High Resilience Foam, Spring Cushion
    Installation Instructions The sofa can be set up in 10 minutes and is recommended for 2 people.
    Note The cushions take 24-48 hours to fully recover due to the compressed packaging. So it is not very soft and comfortable when you first unpack it. You can pat the cushion to make it softer and feel better!

    Vesgantti Small 2-Seater Sofa Blue

    Brown finished wooden furniture leg attached to blue upholstered furniture against olive green wall trim

    Sturdy wooden legs

    They provide durability and support, while the non-slip pads on the bottom prevent the sofa from sliding or scratching the floor.

    in dark blue velvety fabric with tufted backrest and wooden legs,

    Left and right armrests

    They provide arm resting space and allow for comfortable sitting for extended periods.

    Close-up of a blue velvet or plush upholstered piece of furniture featuring detailed button upholstery and a rolled arm or backrest

    2 velvet pillows

    Made of high quality velvet and foam for extra support to ensure maximum comfort.

    in vibrant royal blue velvet or plush fabric, offering a partial view of the upholstered seats

    Plush back cushion

    It provides full support to your back, helping to prevent discomfort and fatigue when sitting for long periods of time.

    Vesgantti Velvet Sofa 121cm with Spring Cushion

    Close-up product demonstration showing a hand pressing on a blue textured surface or fabric

    High resilience foam

    Ensures comfortable and supported seating on your sofa, improving both short-term relaxation and long-term durability.

    Close-up of a bright blue tufted upholstery fabric featuring a detailed button-style tufted pattern and a plush textile texture

    the different partitions

    Provides support to different parts of the body to improve posture and reduce pressure points.

    Close-up of a bright blue fabric with soft, wavy folds creating a rippled texture pattern on a dark background

    Velvety and luxurious texture

    Combining luxurious textures, elegant appearance and practical benefits, they are versatile and durable.

    Modern bright blue velvet loveseat with wooden legs, positioned in a room with a vaulted fireplace and a round wooden coffee table

    Ideal for all occasions

    The Vesgantti small sofa is an excellent choice for anyone looking to enhance their living space without sacrificing style or comfort.

    Brand Vesgantti
    Sofa type Standard
    Room type Home office, Guest room, Bedroom, Study, Living room
    Suitable for outdoor or indoor use Interior
    Orientation horizontal
    Included components Spring cushion, back cushion, seat cushion, velvet pillows
  • Customer Reviews
    No comments